The roof is off and the concrete floor is poured. The upstairs floor comes out on Monday and the framers will be in Tuesday to start getting the first floor ready for the second floor.
You can see the basement now with the floor poured. The post to the left will be removed as that area will be getting framed for the mudroom edition that extends out the back.